{"id":43034,"date":"2024-02-02T07:28:00","date_gmt":"2024-02-02T07:28:00","guid":{"rendered":"https:\/\/vicoliv.md\/finalizarea-lucrarilor-de-reabilitare-a-drumului-spre-orheiul-vechi-un-pas-semnificativ-pentru-comunitate-si-turismul-din-moldova\/"},"modified":"2025-05-07T15:52:29","modified_gmt":"2025-05-07T15:52:29","slug":"completion-of-road-rehabilitation-to-orheiul-vechi-a-significant-step-for-the-community-and-tourism-in-moldova","status":"publish","type":"post","link":"https:\/\/vicoliv.md\/en\/completion-of-road-rehabilitation-to-orheiul-vechi-a-significant-step-for-the-community-and-tourism-in-moldova\/","title":{"rendered":"Completion of road rehabilitation to Orheiul Vechi \u2013 a significant step for the community and tourism in Moldova"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><\/p>\n\n<p class=\"wp-block-paragraph\">With pride and satisfaction, Vicoliv Grup announces the completion of the rehabilitation works for the national public road G73 G72 \u2013 Br\u0103ne\u0219ti \u2013 The &#8220;Orheiul Vechi&#8221; Historical and Cultural Complex \u2013 G69, an essential project for improving the road infrastructure of the region. After months of dedicated work, the 3.5 km stretch of road has been modernized, providing a safe and comfortable path for both the residents of Br\u0103ne\u0219ti and the tourists visiting one of Moldova&#8217;s most important historical destinations. <\/p>\n\n<p class=\"wp-block-paragraph\">The work was launched in the presence of the Minister of Infrastructure and Regional Development, Andrei Sp\u00eenu, who was assured by us that the works would be completed quickly and that the benefits would be quickly felt. Today, as the work has been completed, this commitment has become a tangible reality, and the residents of the region can now enjoy a modernized road, free of dust, with high-quality road infrastructure. <\/p>\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"690\" data-id=\"35430\" src=\"https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup-5-1-1024x690.jpg\" alt=\"\" class=\"wp-image-35430\" srcset=\"https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup-5-1-1024x690.jpg 1024w, https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup-5-1-300x202.jpg 300w, https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup-5-1-768x518.jpg 768w, https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup-5-1-1536x1035.jpg 1536w, https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup-5-1.jpg 2000w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"684\" data-id=\"35424\" src=\"https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup-3-1-1024x684.jpg\" alt=\"\" class=\"wp-image-35424\" srcset=\"https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup-3-1-1024x684.jpg 1024w, https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup-3-1-300x200.jpg 300w, https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup-3-1-768x513.jpg 768w, https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup-3-1-1536x1025.jpg 1536w, https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup-3-1.jpg 2000w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n\n<p class=\"wp-block-paragraph\"><mark style=\"background-color:rgba(0, 0, 0, 0);color:#213e72\" class=\"has-inline-color\"><strong>Project details<\/strong><\/mark><\/p>\n\n<p class=\"wp-block-paragraph\">The rehabilitation works included stabilizing the foundation layers, laying asphalt mixtures, installing curbs, strengthening the shoulders, placing road signs, and applying longitudinal road markings. These measures are essential to ensure travellers&#8217; comfort and safety throughout the journey. <\/p>\n\n<div class=\"wp-block-media-text is-stacked-on-mobile\" style=\"grid-template-columns:29% auto\"><figure class=\"wp-block-media-text__media\"><img decoding=\"async\" width=\"1024\" height=\"1024\" src=\"https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup-8-1024x1024.jpg\" alt=\"\" class=\"wp-image-35440 size-full\" srcset=\"https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup-8-1024x1024.jpg 1024w, https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup-8-300x300.jpg 300w, https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup-8-150x150.jpg 150w, https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup-8-768x768.jpg 768w, https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup-8-1536x1536.jpg 1536w, https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup-8.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure><div class=\"wp-block-media-text__content\">\n<p class=\"wp-block-paragraph\"><mark style=\"background-color:rgba(0, 0, 0, 0);color:#213e72\" class=\"has-inline-color\"><strong>Contractor&#8217;s opinion<\/strong><\/mark><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Anatolie Botnaru<\/strong>, one of the owners of several restaurants and accommodation units in Butuceni, said with emotion and pride: <mark style=\"background-color:rgba(0, 0, 0, 0);color:#213e72\" class=\"has-inline-color\"><em><strong>&#8220;About Butuceni and the road\u2026 It&#8217;s like in Europe now. Come and see! Thanks to the ROAD WORKERS for their quality work!&#8221;  <\/strong><\/em> <\/mark><\/p>\n<\/div><\/div>\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n<p class=\"wp-block-paragraph\">His appreciation reflects the positive impact that the road rehabilitation has on the area&#8217;s economic and tourist development. Butuceni, a picturesque village near Orheiul Vechi, has now become a top destination, and the improvements made to the infrastructure will provide easier and safer access to the historic complex. <\/p>\n\n<p class=\"wp-block-paragraph\"><mark style=\"background-color:rgba(0, 0, 0, 0);color:#213e72\" class=\"has-inline-color\"><strong>Impact on the community and tourism<\/strong><\/mark><\/p>\n\n<p class=\"wp-block-paragraph\">The rehabilitation works will improve accessibility and comfort for locals and promote tourism development in the area. Many tourists can now visit Orheiul Vechi and enjoy the breathtaking scenery, while locals will benefit from better connectivity with other regions of the country. <\/p>\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-2 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"478\" data-id=\"35444\" src=\"https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup_12-1-1024x478.jpg\" alt=\"\" class=\"wp-image-35444\" srcset=\"https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup_12-1-1024x478.jpg 1024w, https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup_12-1-300x140.jpg 300w, https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup_12-1-768x359.jpg 768w, https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup_12-1.jpg 1280w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"478\" data-id=\"35458\" src=\"https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup_17-1024x478.jpg\" alt=\"\" class=\"wp-image-35458\" srcset=\"https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup_17-1024x478.jpg 1024w, https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup_17-300x140.jpg 300w, https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup_17-768x359.jpg 768w, https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup_17.jpg 1280w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"478\" data-id=\"35443\" src=\"https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup_11-2-1024x478.jpg\" alt=\"\" class=\"wp-image-35443\" srcset=\"https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup_11-2-1024x478.jpg 1024w, https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup_11-2-300x140.jpg 300w, https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup_11-2-768x359.jpg 768w, https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup_11-2.jpg 1280w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n\n<p class=\"wp-block-paragraph\"><mark style=\"background-color:rgba(0, 0, 0, 0);color:#213e72\" class=\"has-inline-color\"><strong>Thanks to the community<\/strong><\/mark><\/p>\n\n<p class=\"wp-block-paragraph\">We are deeply touched by the appreciation and gratitude expressed by the residents of Br\u0103ne\u0219ti. They are the heart of this project and are pleased with the changes. Vicoliv Grup reaffirms its commitment to continue contributing to road infrastructure development in Moldova to ensure a better and more prosperous future for the entire community.  <\/p>\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-3 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"478\" data-id=\"35461\" src=\"https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup_16-1024x478.jpg\" alt=\"\" class=\"wp-image-35461\" srcset=\"https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup_16-1024x478.jpg 1024w, https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup_16-300x140.jpg 300w, https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup_16-768x359.jpg 768w, https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup_16.jpg 1280w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"478\" data-id=\"35453\" src=\"https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup_14-1-1024x478.jpg\" alt=\"\" class=\"wp-image-35453\" srcset=\"https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup_14-1-1024x478.jpg 1024w, https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup_14-1-300x140.jpg 300w, https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup_14-1-768x359.jpg 768w, https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup_14-1.jpg 1280w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"478\" data-id=\"35449\" src=\"https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup_13-1-1024x478.jpg\" alt=\"\" class=\"wp-image-35449\" srcset=\"https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup_13-1-1024x478.jpg 1024w, https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup_13-1-300x140.jpg 300w, https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup_13-1-768x359.jpg 768w, https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup_13-1.jpg 1280w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"478\" data-id=\"35452\" src=\"https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup_15-2-1024x478.jpg\" alt=\"\" class=\"wp-image-35452\" srcset=\"https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup_15-2-1024x478.jpg 1024w, https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup_15-2-300x140.jpg 300w, https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup_15-2-768x359.jpg 768w, https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup_15-2.jpg 1280w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n\n<p class=\"wp-block-paragraph\"><mark style=\"background-color:rgba(0, 0, 0, 0);color:#213e72\" class=\"has-inline-color\"><strong>Looking to the future<\/strong><\/mark><\/p>\n\n<p class=\"wp-block-paragraph\">We look to the future with optimism and are confident that this rehabilitated road will become a key element in promoting tourism and improving mobility and road safety throughout the region. We continue to build the future together, with each project completed and every road modernized. <\/p>\n\n<p class=\"wp-block-paragraph\"><em><mark style=\"background-color:rgba(0, 0, 0, 0);color:#213e72\" class=\"has-inline-color\">Thank you to everyone who has been part of this transformation and who continues to support Moldova&#8217;s progress and development!<\/mark><\/em><\/p>\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>With pride and satisfaction, Vicoliv Grup announces the completion of the rehabilitation works for the national public road G73 G72 \u2013 Br\u0103ne\u0219ti \u2013 The &#8220;Orheiul Vechi&#8221; Historical and Cultural Complex \u2013 G69, an essential project for improving the road infrastructure of the region. After months of dedicated work, the 3.5 km stretch of road has&#8230;<\/p>\n","protected":false},"author":1,"featured_media":35462,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[377,378],"tags":[],"post_folder":[474],"class_list":["post-43034","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-2024-en","category-road-construction"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v25.9 (Yoast SEO v25.9) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Completion of road rehabilitation to Orheiul Vechi \u2013 a significant step for the community and tourism in Moldova - Vicoliv Grup<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/vicoliv.md\/en\/completion-of-road-rehabilitation-to-orheiul-vechi-a-significant-step-for-the-community-and-tourism-in-moldova\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Completion of road rehabilitation to Orheiul Vechi \u2013 a significant step for the community and tourism in Moldova\" \/>\n<meta property=\"og:description\" content=\"With pride and satisfaction, Vicoliv Grup announces the completion of the rehabilitation works for the national public road G73 G72 \u2013 Br\u0103ne\u0219ti \u2013 The &#8220;Orheiul Vechi&#8221; Historical and Cultural Complex \u2013 G69, an essential project for improving the road infrastructure of the region. After months of dedicated work, the 3.5 km stretch of road has...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/vicoliv.md\/en\/completion-of-road-rehabilitation-to-orheiul-vechi-a-significant-step-for-the-community-and-tourism-in-moldova\/\" \/>\n<meta property=\"og:site_name\" content=\"Vicoliv Grup\" \/>\n<meta property=\"article:published_time\" content=\"2024-02-02T07:28:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-05-07T15:52:29+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup_16.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"598\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"vicolivm\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"vicolivm\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/vicoliv.md\/en\/completion-of-road-rehabilitation-to-orheiul-vechi-a-significant-step-for-the-community-and-tourism-in-moldova\/\",\"url\":\"https:\/\/vicoliv.md\/en\/completion-of-road-rehabilitation-to-orheiul-vechi-a-significant-step-for-the-community-and-tourism-in-moldova\/\",\"name\":\"Completion of road rehabilitation to Orheiul Vechi \u2013 a significant step for the community and tourism in Moldova - Vicoliv Grup\",\"isPartOf\":{\"@id\":\"https:\/\/vicoliv.md\/en\/ro\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/vicoliv.md\/en\/completion-of-road-rehabilitation-to-orheiul-vechi-a-significant-step-for-the-community-and-tourism-in-moldova\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/vicoliv.md\/en\/completion-of-road-rehabilitation-to-orheiul-vechi-a-significant-step-for-the-community-and-tourism-in-moldova\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup_16.jpg\",\"datePublished\":\"2024-02-02T07:28:00+00:00\",\"dateModified\":\"2025-05-07T15:52:29+00:00\",\"author\":{\"@id\":\"https:\/\/vicoliv.md\/en\/ro\/#\/schema\/person\/1e197d995e9995c52a134b74bf081244\"},\"breadcrumb\":{\"@id\":\"https:\/\/vicoliv.md\/en\/completion-of-road-rehabilitation-to-orheiul-vechi-a-significant-step-for-the-community-and-tourism-in-moldova\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/vicoliv.md\/en\/completion-of-road-rehabilitation-to-orheiul-vechi-a-significant-step-for-the-community-and-tourism-in-moldova\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/vicoliv.md\/en\/completion-of-road-rehabilitation-to-orheiul-vechi-a-significant-step-for-the-community-and-tourism-in-moldova\/#primaryimage\",\"url\":\"https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup_16.jpg\",\"contentUrl\":\"https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup_16.jpg\",\"width\":1280,\"height\":598},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/vicoliv.md\/en\/completion-of-road-rehabilitation-to-orheiul-vechi-a-significant-step-for-the-community-and-tourism-in-moldova\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Prima pagin\u0103\",\"item\":\"https:\/\/vicoliv.md\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Completion of road rehabilitation to Orheiul Vechi \u2013 a significant step for the community and tourism in Moldova\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/vicoliv.md\/en\/ro\/#website\",\"url\":\"https:\/\/vicoliv.md\/en\/ro\/\",\"name\":\"Vicoliv Grup\",\"description\":\"Construim Viitorul \u00cempreun\u0103!\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/vicoliv.md\/en\/ro\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/vicoliv.md\/en\/ro\/#\/schema\/person\/1e197d995e9995c52a134b74bf081244\",\"name\":\"vicolivm\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/vicoliv.md\/en\/ro\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7a30c40dbe73574465ce4dc51ba2f3e32b802b3a037f996ff87a49ee5b405860?s=96&d=blank&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7a30c40dbe73574465ce4dc51ba2f3e32b802b3a037f996ff87a49ee5b405860?s=96&d=blank&r=g\",\"caption\":\"vicolivm\"},\"sameAs\":[\"https:\/\/vicoliv.md\"],\"url\":\"https:\/\/vicoliv.md\/en\/author\/vicolivm\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Completion of road rehabilitation to Orheiul Vechi \u2013 a significant step for the community and tourism in Moldova - Vicoliv Grup","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/vicoliv.md\/en\/completion-of-road-rehabilitation-to-orheiul-vechi-a-significant-step-for-the-community-and-tourism-in-moldova\/","og_locale":"en_US","og_type":"article","og_title":"Completion of road rehabilitation to Orheiul Vechi \u2013 a significant step for the community and tourism in Moldova","og_description":"With pride and satisfaction, Vicoliv Grup announces the completion of the rehabilitation works for the national public road G73 G72 \u2013 Br\u0103ne\u0219ti \u2013 The &#8220;Orheiul Vechi&#8221; Historical and Cultural Complex \u2013 G69, an essential project for improving the road infrastructure of the region. After months of dedicated work, the 3.5 km stretch of road has...","og_url":"https:\/\/vicoliv.md\/en\/completion-of-road-rehabilitation-to-orheiul-vechi-a-significant-step-for-the-community-and-tourism-in-moldova\/","og_site_name":"Vicoliv Grup","article_published_time":"2024-02-02T07:28:00+00:00","article_modified_time":"2025-05-07T15:52:29+00:00","og_image":[{"width":1280,"height":598,"url":"https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup_16.jpg","type":"image\/jpeg"}],"author":"vicolivm","twitter_card":"summary_large_image","twitter_misc":{"Written by":"vicolivm","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/vicoliv.md\/en\/completion-of-road-rehabilitation-to-orheiul-vechi-a-significant-step-for-the-community-and-tourism-in-moldova\/","url":"https:\/\/vicoliv.md\/en\/completion-of-road-rehabilitation-to-orheiul-vechi-a-significant-step-for-the-community-and-tourism-in-moldova\/","name":"Completion of road rehabilitation to Orheiul Vechi \u2013 a significant step for the community and tourism in Moldova - Vicoliv Grup","isPartOf":{"@id":"https:\/\/vicoliv.md\/en\/ro\/#website"},"primaryImageOfPage":{"@id":"https:\/\/vicoliv.md\/en\/completion-of-road-rehabilitation-to-orheiul-vechi-a-significant-step-for-the-community-and-tourism-in-moldova\/#primaryimage"},"image":{"@id":"https:\/\/vicoliv.md\/en\/completion-of-road-rehabilitation-to-orheiul-vechi-a-significant-step-for-the-community-and-tourism-in-moldova\/#primaryimage"},"thumbnailUrl":"https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup_16.jpg","datePublished":"2024-02-02T07:28:00+00:00","dateModified":"2025-05-07T15:52:29+00:00","author":{"@id":"https:\/\/vicoliv.md\/en\/ro\/#\/schema\/person\/1e197d995e9995c52a134b74bf081244"},"breadcrumb":{"@id":"https:\/\/vicoliv.md\/en\/completion-of-road-rehabilitation-to-orheiul-vechi-a-significant-step-for-the-community-and-tourism-in-moldova\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/vicoliv.md\/en\/completion-of-road-rehabilitation-to-orheiul-vechi-a-significant-step-for-the-community-and-tourism-in-moldova\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/vicoliv.md\/en\/completion-of-road-rehabilitation-to-orheiul-vechi-a-significant-step-for-the-community-and-tourism-in-moldova\/#primaryimage","url":"https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup_16.jpg","contentUrl":"https:\/\/vicoliv.md\/wp-content\/uploads\/2025\/02\/vicoliv_grup_16.jpg","width":1280,"height":598},{"@type":"BreadcrumbList","@id":"https:\/\/vicoliv.md\/en\/completion-of-road-rehabilitation-to-orheiul-vechi-a-significant-step-for-the-community-and-tourism-in-moldova\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Prima pagin\u0103","item":"https:\/\/vicoliv.md\/en\/"},{"@type":"ListItem","position":2,"name":"Completion of road rehabilitation to Orheiul Vechi \u2013 a significant step for the community and tourism in Moldova"}]},{"@type":"WebSite","@id":"https:\/\/vicoliv.md\/en\/ro\/#website","url":"https:\/\/vicoliv.md\/en\/ro\/","name":"Vicoliv Grup","description":"Construim Viitorul \u00cempreun\u0103!","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/vicoliv.md\/en\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/vicoliv.md\/en\/ro\/#\/schema\/person\/1e197d995e9995c52a134b74bf081244","name":"vicolivm","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/vicoliv.md\/en\/ro\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7a30c40dbe73574465ce4dc51ba2f3e32b802b3a037f996ff87a49ee5b405860?s=96&d=blank&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7a30c40dbe73574465ce4dc51ba2f3e32b802b3a037f996ff87a49ee5b405860?s=96&d=blank&r=g","caption":"vicolivm"},"sameAs":["https:\/\/vicoliv.md"],"url":"https:\/\/vicoliv.md\/en\/author\/vicolivm\/"}]}},"_links":{"self":[{"href":"https:\/\/vicoliv.md\/en\/wp-json\/wp\/v2\/posts\/43034","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vicoliv.md\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vicoliv.md\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vicoliv.md\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/vicoliv.md\/en\/wp-json\/wp\/v2\/comments?post=43034"}],"version-history":[{"count":0,"href":"https:\/\/vicoliv.md\/en\/wp-json\/wp\/v2\/posts\/43034\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vicoliv.md\/en\/wp-json\/wp\/v2\/media\/35462"}],"wp:attachment":[{"href":"https:\/\/vicoliv.md\/en\/wp-json\/wp\/v2\/media?parent=43034"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vicoliv.md\/en\/wp-json\/wp\/v2\/categories?post=43034"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vicoliv.md\/en\/wp-json\/wp\/v2\/tags?post=43034"},{"taxonomy":"post_folder","embeddable":true,"href":"https:\/\/vicoliv.md\/en\/wp-json\/wp\/v2\/post_folder?post=43034"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}